Industrial · India
India Cabinet Approves $1.2 Billion Construction Equipment Production Scheme
The eight-year program offers sales-linked incentives to equipment and component makers as New Delhi tries to cut reliance on imported machines.
By vaayaa News Desk · · 3 min read

India's Union Cabinet on Wednesday approved a scheme worth about 110 billion rupees, or roughly $1.2 billion, to expand domestic manufacturing of construction and infrastructure equipment over eight years, the government announced. The program, cleared at a meeting chaired by Prime Minister Narendra Modi, will be run by the Ministry of Heavy Industries and starts in the 2026-27 financial year.
The decision covers machines India currently buys from abroad, including tunnel boring machines, off-highway trucks, hydraulic excavators, cranes, loaders, piling rigs and drilling machines. According to the government, seven equipment categories and five component groups such as engines and transmission systems will qualify for support. The plan also provides for a dedicated testing facility for the sector.
Why New Delhi Is Acting
Information and Broadcasting Minister Ashwini Vaishnaw told reporters that the domestic industry is the world's third largest, with a market of about 97,000 crore rupees in 2024-25, yet around 45 percent of demand is met by imports. Government figures put imports of equipment and components at close to 34,500 crore rupees that year, most of it components and aggregates.
The cabinet approval came a week after China introduced export controls on tunnel boring machines and related machinery, a step that exposed how dependent Indian infrastructure projects are on foreign suppliers. China holds about 70 percent of the global tunnel boring machine market. Separately, Washington proposed tariffs of up to 25 percent on Indian goods under an investigation into manufacturing capacity and industrial policy, adding pressure on New Delhi's subsidy strategy.
Vaishnaw said the program is expected to attract 2,100 crore rupees in investment and substitute 2,250 crore rupees of imports. The government projects the construction equipment market will more than double to about 228,100 crore rupees by 2029-30, helped by spending on roads, ports, railways and housing.
How the Incentives Work
Approved original equipment manufacturers and component makers, including smaller suppliers, will receive sales-linked payments on incremental sales of eligible products. Officials at companies such as JCB, Caterpillar and Hitachi are among those expected to take part. Incentive rates will start at 13 percent and taper to 8 percent over five years of disbursement running from 2028-29 to 2032-33, after a two-year period for setting up plants. A final year, 2033-34, is set aside to settle incentives tied to sales booked in 2032-33.
The structure gives manufacturers time to build capacity before payments begin, which matters because heavy equipment lines require tooling, testing and trained staff before output can rise. Analysts at ICRA said the program could improve the economics of local production in a sector where imports account for more than half of raw material and component costs.
What It Means for Workers
For engineers, welders, machinists and quality inspectors, the scheme signals a likely shift in hiring toward plants that assemble and test complex machines rather than sites that only import and service them. Skills in fabrication, hydraulic systems, controls and testing are likely to be in demand if the incentive program brings the investment the government expects. The dedicated testing facility could also create roles in certification and quality assurance.
The plan follows a pattern of production-linked support for Indian manufacturing, but it also carries risks. The market reaction was immediate, with shares of Action Construction Equipment rising 8 percent the day after the cabinet decision, showing that investors expect listed suppliers to benefit. Whether the jobs and local content follow will depend on how quickly approved projects move from planning to production.
The next milestones are the publication of detailed eligibility rules, the signing of participating manufacturers and progress on the testing center. Analysts will also watch trade talks with Washington and any further Chinese export restrictions, since both could change the cost of components and the pace at which Indian capacity comes online.
Written by the vaayaa News Desk, based on public reports, company statements and official data.